By Sharon Brennan2021-03-26T05:40:00
Source: Post Photographic
Most clinical commissioning group teams at ‘sub-ICS level’ should not be operating by October, as they are effectively subsumed by integrated care systems, new NHS England guidance says.
With a HSJ subscription you’ll unlock:
Part of HSJ Information Ltd. 5th Floor, Aldgate Tower, 2 Leman Street, London E1 8FA. Registered in England and Wales. Company registration 2530185
Site powered by Webvision Cloud