2013-02-20T15:55:00
PERFORMANCE: A&E performance at the Univerrsity Hospital of South Manchester Foundation Trust slid to below 84 per cent against the four hour target in the early part of January.
With a HSJ subscription you’ll unlock:
Part of HSJ Information Ltd. 5th Floor, Aldgate Tower, 2 Leman Street, London E1 8FA. Registered in England and Wales. Company registration 2530185
Site powered by Webvision Cloud