All North West articles – Page 89
-
HSJ Local
North Cumbria records savings of £3.6m to end of August
FINANCE: The trust delivered savings of £3.6m in the months to the end of August, against a target for the full year 2012-13 of £16.9m, latest board papers state.
-
HSJ Local
Southport and Ormskirk waiting times performance under pressure
PERFORMANCE: Problems with theatre staffing and bed capacity have caused a rise in the number of patient waits exceeding the national 18-week threshold, board papers state.
-
HSJ Local
Four overdue patient safety alerts for the Walton Centre
PERFORMANCE: The trust had four overdue patient safety alerts in September, according to latest central alerting system data.
-
HSJ Local
Lancashire Teaching Hospitals in deficit and £1.7m behind plan
FINANCE: The foundation trust’s August finance report shows a year-to-date deficit of £588,100 after exceptional items, against a planned surplus for the period of £1.1m.
-
HSJ Local
Four overdue patient safety alerts for Aintree
PERFORMANCE: The number of overdue patient safety alerts outstanding for the trust has dropped to four, according to latest central alerting system data.
-
HSJ Local
Six outstanding patient safety alerts at Aintree
PERFORMANCE: The trust’s commissioners have reported that it has six overdue patient safety alerts.
-
HSJ Local
St Helens and Knowsley Clostridium difficile cases above plan
PERFORMANCE: The trust currently has 11 recorded cases of Clostridium difficile infection in 2012-13 against a plan for the year to date of six, commissioner board papers state.
-
HSJ Local
Rise in emergency admissions at Southport and Ormskirk
PERFORMANCE: An increase in emergency admissions at Southport and Ormskirk has pushed NHS Merseyside 2 per cent over its plan for non-elective activity for the year-to-date, the primary care trust cluster has reported.
-
HSJ Local
Provisional data shows RTT waiting targets underperformance at Walton centre
PERFORMANCE: Provisional June data shows “underperformance” by the Walton Centre against national 18 week referral-to-treatment waiting targets, NHS Merseyside’s latest performance report states.
-
HSJ Local
St Helens and Knowsley exceeds annual MRSA threshold
PERFORMANCE: The trust has already exceeded its target maximum number of MRSA cases for 2012-13, NHS Merseyside’s August performance report shows.
-
HSJ Local
Commissioners forecast East Lancashire Hospitals overspend of £8.6m
FINANCE: Lancashire commissioners had overspent their budgets for the trust by £2.7m by the end of July, and were forecasting an £8.6m overspend for the full year 2012-13.
-
HSJ Local
Aintree appeals against third recorded MRSA case
PERFORMANCE: The foundation trust currently has three recorded cases of MRSA for 2012-13, against an annual target of no more than two, commissioner board papers report.
-
HSJ Local
Blackpool Teaching Hospitals forecast to overperform by £8.1m
FINANCE: Lancashire primary care trusts are forecasting an overspend of £8.1m on their contracts with Blackpool Teaching Hospitals in 2012.
-
HSJ Local
Bury misses health checks target for Q1
PERFORMANCE: Just 830 people in NHS Bury’s catchment were offered health checks in the first quarter of 2012-13, against a target of 2,000, NHS Greater Manchester board papers show.
-
HSJ Local
North Manchester CCG picks reverend as lay chair
STRUCTURE: North Manchester CCG has picked Tim Presswood, a lay member and minister of a baptist church, as its chairman.
-
HSJ Local
Cumbria CCG to buy support from North East CSU
COMMERCIAL: The NHS Commissioning Board has finalised commissioning support arrangements in Cumbria and Lancashire.
-
News
Manchester’s major shake-up revealed
HSJ can reveal details of a major review of healthcare across Greater Manchester which makes the clinical case for a radical redesign of services. It is believed this could prompt some leaders to argue for the removal of acute surgery from four hospitals.
-
HSJ Local
Manchester CSU boss appointed
WORKFORCE: Leigh Griffin has been appointed managing director of the Greater Manchester commissioning support unit.
-
HSJ Local
Pennine Acute hit waiting times targets for July, figures suggest
PERFORMANCE: “Unvalidated figures” show that Pennine Acute achieved all national standards for referral-to-treatment waiting times in July, commissioner board papers state.
-
HSJ Local
Commissioners apply 'contract levers' over WWL diagnostic waits
PERFORMANCE: Commissioners are applying “contract levers” to the trust for failing to meet the target of having no more than one per cent of diagnostics patients waiting for more than six weeks.