All UNITED LINCOLNSHIRE HOSPITALS NHS TRUST articles – Page 6
-
News
In full: Pathology network proposals
HSJ approached the 29 pathology networks proposed by NHS Improvement to ask if local trusts had signed up. In most cases the proposed “hub” trust was able to answer on behalf of its network.
-
Comment
Shocking deterioration in RTT waiting times
Elective RTT waiting times shot up by over a week in December, in the fastest monthly increase since 2010, notes Rob Findlay
-
News
Year-plus elective waiters at highest number since 2012
The number of patients waiting more than a year for an elective procedure is at its highest since August 2012, new data reveals.
-
News
NHS Improvement abandons consultancy turnaround programme
A financial turnaround project where management consultants are sent to work with NHS trusts has been shelved by NHS Improvement, HSJ has learned.
-
News
Waiting times steady despite slowdown in admissions
Yet another large trust stopped reporting its referral to treatment data, which clouded the picture for the latest November figures and raised non-reported waiting lists to a new record.
-
Comment
Record numbers of patients missing from official waiting lists
Yet another trust stopped reporting its waiting list data in October, bringing the estimated number of missing patients to its highest ever level.
-
News
Revealed: Seven trusts breaching break even duty until 2022
Seven NHS trusts believe they will not technically break even for five years or more, with two requiring until 2026, HSJ analysis reveals.
-
News
Trusts must reduce deficits by two-thirds to hit official forecast
NHS trusts must reduce their combined monthly deficit to £107m to meet the official forecast figures in the second half of 2017-18, after recording a monthly deficit of almost £300m in the first half of the year.
-
News
Exclusive: Multiple CCGs consider minimum waiting times
An increasing number of clinical commissioning groups are considering the introduction of controversial minimum waiting times for “non urgent” NHS procedures, despite clinical and legal concerns, HSJ has learned.
-
Expert Briefing
Performance Watch: Chucking the basket cases on the scrapheap
Welcome to HSJ’s new Performance Watch expert briefing. Our new fortnightly newsletter will delve into the most pressing performance matters troubling system leaders and provide unrivalled insight into what they plan to do about them.
-
HSJ Local
Backlog of 30,000 reports after vanguard IT system failure
The rollout of a multimillion pound vanguard project imaging system to University Hospitals Leicester Trust led to a 30,000 backlog in image reports, HSJ has learned.
-
News
Patient images sent by taxi after £30m IT system breaks down
Doctors have been forced to send images from patient scans on DVDs in taxis to neighbouring hospitals after a £30m IT system failed across eight hospitals.
-
HSJ Local
Trust facing £75m deficit needs extra millions for fire safety improvements
A trust forecasting a £75m deficit this year has warned capital projects, including bolstering cybersecurity, could be delayed by a £5.1m shortfall in its fire safety funding.
-
News
Revealed: 21 trusts consistently underperforming on A&E
There are 21 trusts whose performance against the four hour emergency target has been consistently below 85 per cent since April, HSJ analysis reveals.
-
HSJ Local
Special measures trust faces 'one of the biggest financial challenges in NHS'
A trust facing a deficit of £75.2m has appointed external consultants as it faces what its deputy chief executive called “one of the biggest financial challenges in the NHS”.
-
News
Daily Insight: Shrinking deficit or history repeating?
The must read stories and debate in healthcare
-
News
Revealed: The NHS trusts falling well short of financial plans
Several acute trusts have fallen significantly short of their three month financial target, while dozens more are relying on heavily backloaded savings plans to deliver their year end plans.
-
HSJ Local
NHS Improvement appoints 'buddy' for special measures trust
A provider in both financial and quality special measures has been given a “buddy” trust by NHS Improvement to improve its position.
-
News
Exclusive: Third trust reveals large neurology backlog
A trust in the East Midlands has become the latest to reveal it has hundreds of neurology patients overdue follow up appointments due to a lack of capacity.