By Sophie Barnes2015-06-25T12:37:00
STRUCTURE: A £480m hospital rebuild backed by the Treasury more than a year ago is still awaiting final sign-off before construction can begin.
With a HSJ subscription you’ll unlock:
Part of HSJ Information Ltd. 5th Floor, Aldgate Tower, 2 Leman Street, London E1 8FA. Registered in England and Wales. Company registration 2530185
Site powered by Webvision Cloud